Site preparation

February 10, 2007 in Site Preparation

There is an existing logging road to the proposed Falcon building site which will need to be graded and graveled. I’ll need to bring power and water to the site as well. The workshop building will also need power and water and septic. The workshop will need to be close enough so that moving components and materials back and forth is practical, but far enough away so as not to interfere with any sightlines.




Leave a reply

You must be logged in to post a comment.