Container workshop foundation and basement excavation continues

June 24, 2008 in Foundation, Site Preparation

Planning on having a basement under each container stack with a floor-to-ceiling height of 8 feet. There will be concrete foundation footers poured, then 8 inch block walls built up for the containers to sit on. Heavy rebar will be tied into the footers, extend up through the block wall and be welded to the rails on the bottom of the first level of containers.